Property Developers
Infrastructure Firms
Engineering Firms
Blog
Events
Tutorials
Help Center
Documents

Site built to Rev C. Rev D was in an email. A drawing register with receipts.

Every drawing revision issued through Lobocon records who issued it, who received it and when it was opened. Superseded revisions are stamped, not deleted, so the question of what was current on the 12th has one answer.

Drawing register · S-201

Level 1 slab reinforcement

Primark Apartments

Rev D current
RevStatusIssuedReceived
Rev DCurrent11 Sep 10:02
by A. Kamau
K. Otieno 11 Sep 10:31P. Achieng 11 Sep 12:05
Rev CSuperseded 11 Sep28 Aug 15:40
by A. Kamau
K. Otieno 28 Aug 16:12
Rev BSuperseded 28 Aug02 Aug 09:15
by A. Kamau
K. Otieno 02 Aug 11:00

Ships inside your pilot. Built with your site team on your live project.

The problem

Two channels, two revisions, one site building to the wrong one.

Before Lobocon
  • xRev C went to the group chat.
  • xRev D went in an email to the PM.
  • xThe site printed Rev C.
With Lobocon
  • vOne register, with Rev D marked current.
  • vRev C stamped superseded on the date it happened.
  • vReceipts recorded against names.

What it does

One register. Every revision accounted for.

Revisions

Revisions in a chain

Each drawing carries its revisions in order. The current one is flagged, the rest are stamped superseded with the date, and nothing is deleted.

app.lobocon.co/projects/primark/drawings/S-201

Revisions · S-201

Level 1 slab reinforcement

Rev DIssued 11 SepCurrent
Rev CSuperseded 11 SepSuperseded
Rev BSuperseded 28 AugSuperseded
Rev ASuperseded 02 AugSuperseded
Receipts

Receipts, not read receipts

Issue a revision to named people and the register records when each of them opened it. The transmittal is the record.

app.lobocon.co/projects/primark/transmittals/TR-019

Transmittal · TR-019

S-201 Rev D

Issued 11 Sep 10:02
KO

K. Otieno

Site agent

Opened 11 Sep 10:31
PA

P. Achieng

Foreman

Opened 11 Sep 12:05
SN

S. Njoroge

Steel fixer

Not opened yet
Files

Files that stay with the project

Documents up to 100 MB and photos up to 20 MB, in folders with tags, stored encrypted and exportable at any time.

app.lobocon.co/projects/primark/files

Project files

Primark Apartments

Drawings

142 files

Site photos

1,208 files

Contracts

12 files

S-201_RevD.pdfStructural8.4 MB
IMG_2231.jpgSlab B24.1 MB

Documents up to 100 MB, photos up to 20 MB. Encrypted at rest.

Common questions

What site teams ask us first.

WhatsApp us on +254 746 884 254 or email ndungufrank01@gmail.com if your question is not here.

What exists today?

Project files: upload, folders and tags. Revisions, the superseded stamp and receipts are built inside your pilot.

Where are files stored?

Encrypted object storage hosted in the EU, with daily backups and a monthly copy delivered to storage you control.

Can we take our documents with us?

Yes, at any time and at exit, at no charge.

One live project.
Ninety days.

The pilot is KES 300,000, credited against your first year if you continue. Message us with how many projects you are running.