The Engineer questioned your interim certificate. Show the record, not a spreadsheet.

Every quantity in a Lobocon report carries who entered it, when, and why it changed. Certified work, actual cost and CPI come from the same entries your site team makes, so the report is the evidence.

Audit trail · IPC-07

Primark Apartments

Every quantity with a name, a time and a reason

Export to Excel
ItemQtyEntered byWhenReason
Concrete slab B2412 → 438 m³J. Mwangi QS14 Sep 16:10Re-measured with the RE on site
Rebar Y1618.4 tP. Achieng12 Sep 09:22Delivery note DN-2231
Formwork level 11,240 m²J. Mwangi QS15 Sep 11:48Certified by the RE

The problem

Four spreadsheets, three numbers, one certificate.

Before Lobocon
  • xIPC-07_v2.xlsx
  • xIPC-07_v2_final.xlsx
  • xIPC-07_FINAL_use_this.xlsx
  • xIPC-07_FINAL_v3.xlsx
  • xNo names on any change, and no times.
With Lobocon
  • vOne table for the certificate.
  • vEvery change carries a name, a time and a reason.
  • vExported to Excel when the Engineer asks.

What it does

The report is the evidence. Not a copy of it.

Audit trail

A reason on every change

Resource plan edits, requisitions and attachments, and schedule baselines require a reason before they save. The log keeps the before and after value of every field.

app.lobocon.co/projects/primark/audit

Audit history

Primark Apartments

Reason required to save
Requisition RQ-118 · Quantity16 Sep 08:05
40 bags→55 bagsP. Achieng, Site agent

ReasonSlab B2 pour moved forward a day.

Resource plan · Tower crane hire15 Sep 14:40
6 wks→8 wksJ. Mwangi, QS

ReasonProgramme re-baselined to v2.

Earned value

CPI and cash from the same entries

Earned value, cost performance and cash position are computed from the progress and cost your team records, not from a separate spreadsheet that has to be reconciled.

app.lobocon.co/projects/primark/earned-value

Earned Value

Primark Apartments

Excellent

BAC

KES 12.5M

EV

KES 4.88M

AC

KES 4.20M

CPI

1.16

EAC

KES 10.8M

Earned value fromBOQ progress entries
Actual cost fromApproved expenses
Last entryJ. Mwangi QS · 15 Sep 11:48
Exports

Reports you can hand over

Export BOQ progress, earned value and cash flow to Excel and CSV at any time, and give the Engineer or the client a read-only login instead of a PDF.

app.lobocon.co/projects/primark/reports

Reports

Hand it over

Export

BOQ progress↓ Excel
Earned value↓ Excel
Cash flow↓ CSV

Client access

MW

M. Wanjiru

Resident Engineer

Read-only

Common questions

What site teams ask us first.

WhatsApp us on +254 746 884 254 or email ndungufrank01@gmail.com if your question is not here.

Which changes are logged?

Resource plan edits, requisitions and their attachments, and schedule baselines. Each entry records who, when, the reason, and the before and after values.

Can I export a report?

Yes. Excel and CSV for every BOQ and financial table, at no charge.

Can the client see the numbers?

Yes, through a read-only role. They see the same live figures your team sees.

One live project.
Ninety days.

The pilot is KES 300,000, credited against your first year if you continue. Message us with how many projects you are running.