Every resource on site, planned and actual. Labour, materials, fuel, subcontractors, equipment.

One resource plan per project, in the six categories your QS already uses. Planned cost from quantity and rate, actual cost from what site used, variance and status per line, and requisitions that go from draft to received with a reason at every step.

Resource plan, Lot II access road

Plan total against actual to date, week 18 of 78

6 categories

Plan total

KES 612.4M
Materials318.4M 52%
Equipment79.6M 13%
Fuel49.0M 8%
Labour67.4M 11%
Subcontractors30.6M 5%
Other67.4M 11%

The problem

The resource plan lives in a workbook only the QS can open.

The site never sees the budget line it is spending.

Today
  • One workbook, one owner, one laptop
  • Actuals typed in at month end
  • Fuel estimated, plant hours guessed
  • Subcontractor claims in a separate file
With Lobocon
  • The workbook imported once; lines added by hand survive a re-import
  • The site diary feeds the actuals every day
  • Fuel from machine hours times consumption
  • Requisitions linked to BOQ items, stockout and over-budget flags before the meeting

What it does

Six categories. One plan, one set of actuals.

Five things the module does with what site records.

Planned cost

Six categories, one plan

Materials, equipment, labour, subcontractors, fuel and other. Every line carries planned quantity and rate, used quantity, actual cost, variance and a status: not started, in progress, on track, over budget or complete.

LinePlannedUsedActualStatus
Cement 42.5N4,800 bags at KES 8904,272,0002,910 bags2,589,900On track
Excavator 20 to 30 t1,900 h at KES 6,50012,350,0001,412 h9,178,000On track
Diesel, plant fleet210,000 L at KES 19240,320,000148,300 L42,081,600Over budget
Masons18 at KES 1,400 a day11,793,600312 days7,862,400On track
Line marking subcontractlump sum4,200,00000Not started
Requisitions

Requisitions with a reason at every step

Draft, pending approval, approved, received. Each requisition links to a BOQ bill and item, carries the quote, the delivery note or the GRN, and a history of who moved it, when, and why.

DraftPending approvalApprovedReceived

tw9-bx2 Crushed stone, sub-base

Bill 2, Pavement. Sub-base, crushed stone. Due 28 Sep

Approved
Quantity500 m3 at KES 2,200
EstimateKES 1,100,000
Attachedquote-quarry.xlsx

24 Sep, 08:30 S. Cheruiyot raised it. Sub-base layer for pavement build-up.

26 Sep, 10:15 N. Singh approved it. Approved against the pavement bill.

pending Received, awaiting GRN.

Site diary

The site diary feeds the actuals

The site engineer records manpower, equipment hours and materials received each day, on a phone, with or without signal. The diary writes the usage logs and inventory that actual cost is built from, tagged to the programme week.

Site diary, Thu 24 Sep

Week 18, entered by Eng. Njuguna, 17:42

Saved offline, will sync

Manpower

On site84 of 90 planned
Masons 18, steel fixers 12, labourers 38-6

Equipment

Excavator 20 to 30 t8.5 h
Vibratory roller6.0 h

Materials received

Cement 42.5N120 bags
Fuel and plant

Fuel and plant, not guessed

Fuel burn is machine hours times consumption at the diesel rate, per plant. Plant utilisation, machine totals and levelling show what is working, what is idle and what is double-booked.

PlantHoursL per hLitresKES
Excavator 20 to 30 t8.51815329,376
Vibratory roller6.0127213,824
Motor grader01500
Motor grader utilisation, week 18Idle 3 days

41 percent. Dry-hire accruing at KES 12,000 a day.

Recommendations

Flags before the stockout

Lobocon reads the plan against usage and tells you what to do: raise a requisition before a material runs out, monitor a line that has passed its budget, confirm a resource that is budgeted but idle.

Critical

Diesel, plant fleet has passed its budget by KES 1.76M. Monitor closely.

Warning

Cement 42.5N runs out in 9 days at the current rate. Raise a requisition.

Warning

Motor grader is budgeted but unused past week 1. Confirm it is still required.

OK

Masons are being consumed within budget.

Questions

Before you message.

Can we import our existing resource workbook?

Yes. The import builds the plan and a re-import refreshes imported lines while leaving the lines you added by hand.

Does the site diary work without signal?

Yes. Entries save on the phone and sync when it is back online.

How are subcontractors handled?

As their own category. Each subcontract is a plan line with its own requisitions and claims, tracked against its budget like any other resource.

Know what is idle before it costs you.